Parts are being made at the rate of one every 10 minutes. They are of two types, A and B. And are mixed randomly with about 10% being type B. A separate inspector is assigned to examine each part. Inspection of part A takes 6 ± 2 minutes. Both inspector rejects 10% of parts they inspect. Draw GPSS block diagram to simulate the above problem for 100 parts.
This answer is restricted. Please login to view the answer of this question.
Login NowClick here to submit your answer.