Parts are being made at the rate of one every 10 minutes. They are of two types, A and B. And are mixed randomly with about 10% being type B. A separate inspector is assigned to examine each part. Inspection of part A takes 6 ± 2 minutes. Both inspector rejects 10% of parts they inspect. Draw GPSS block diagram to simulate the above problem for 100 parts.